Start to punch list

The whole interior remodel, phase by phase

An interior remodel is a sequence, and most of the pain comes from doing the right things in the wrong order. This is the whole sequence — what happens, what you decide, what we handle, and the specific way each phase goes wrong.

Twelve phases, from the first call to the day the punch list closes.

  1. Before anything else we establish whether this is a project we should be doing together — scope, city, rough timeline, budget direction, and whether a condo association is involved.

    You decide

    • What rooms are in scope
    • Rough budget direction
    • How soon you want to start

    We handle

    • Fit assessment
    • Whether the scope needs a permit
    • Which next step is right: showroom, call, or onsite

    Skipping the budget conversation to stay comfortable. A design built for the wrong number wastes weeks and ends in a re-do.

Two things worth saying plainly

Where remodels actually break.

The calendar is set by lead times, not by labor

Homeowners assume construction duration is the schedule. It usually is not. Cabinet lead times, permit queues and condo approval windows decide when a project can start and finish, which is why ordering and approvals get treated as real phases here rather than paperwork.

Late decisions are the expensive ones

Changing a door profile during the render costs nothing. Changing it after cabinets are ordered means counters, tile and schedule all move with it. The whole design sequence exists to push decisions earlier, while they are still cheap.

Process questions

What people ask before starting.

How long does a full kitchen remodel take from first call to handover?
Design and decision phases typically run several weeks, and construction commonly runs one to two months for a kitchen, but the honest answer is that lead times, permits and condo approvals drive the calendar more than the work does. You get a sequence built around your actual scope rather than a generic number.
When do I have to make the hard decisions?
Layout comes first, materials second, and everything is locked before ordering. The rendering sign-off is the last point where changes are free. After that, a swap ripples into counters, tile and schedule.
What usually goes wrong in a remodel?
Three things, in order: demolishing before long-lead items are confirmed, discovering undocumented old plumbing or previous work once walls are open, and underestimating condo association requirements like acoustic ratings and approved work windows. Sequencing and early approvals are how each one is contained.
Do you handle permits and condo association approvals?
Yes — permit applications where the scope requires them, and association document packages including insurance certificates, work-hour schedules and material specifications. You supply the association contacts; we prepare the paperwork.
Can I live in the house during the remodel?
Often yes for a single-room project, with site protection and dust control, though a kitchen means planning where you will actually cook and wash up for several weeks. That conversation belongs in the first phase, not the third.